Project Details
Project Details
Project Details
As part of a campus wide infrastructure and safety upgrade, Multnomah Athletic Club (MAC) wanted to evaluate and improve the campus fall protection systems. GBD Architects and PRC met with MAC maintenance personnel to collect information regarding known fall protection concerns. Once the data was collected, GBD and PRC toured the campus over several days, reviewing the reported concerns and evaluating additional vulnerabilities. Upon completion of the tours and evaluations, a Fall Protection Schematic Design report was presented to MAC for review and comment. The Schematic Design recommendations were agreed upon by MAC, allowing GBD and PRC to create a conceptual scope of work for use to obtain contractor bids to complete the fall protection design and installation. PRC performed periodic progress and conceptual compliance reviews during construction, ensuring that the finish product met the desired expectations and concepts outlined in the approved Schematic Design.