Project Details
Project Details
PRC provided building envelope assistance for SERA Architects from early in the project design phase. Design assistance included: outlining recommendations for material selection and building envelope systems, attending design meetings, providing sketches of anticipated systems and detail conditions, received and reviewed the 30%, 60% and 95% design packages. During construction PRC’s tasks shifted to assistance with submittal review, responding to RFI, and providing periodic site visits to verify that installation was in compliance with both the Construction Documents and manufacturer’s installation instructions.